You don't have javascript enabled. Good luck with that.
Pencarian
 Sudin Bina Marga Jakpus Bersihkan MCB di Jalan Jenderal Gatot Subroto

Dirty MCB Blocks on Jalan Jenderal Gatot Subroto Cleaned

We also deploy a reservoir truck to spray them (MCB blocks)

The Central Jakarta Bina Marga Sub-agency is cleaning the movable concrete barrier (MCB) blocks, which are on the Transjakarta lane on Jalan Jenderal Gatot Subroto.

Road and Bridge Division Head, Yudha Catur Suhartanto said the MCB block cleaning has been ongoing since Wednesday (10/25) by deploying seven personnel.

Bina Marga Personnel Repairing Damaged MCBs on Several Roads

"We also deploy a reservoir truck to spray them (MCB blocks)," he expressed, Monday (1/30).

He targets the MCB block length to be cleaned could reach 3.8 kilometers, precisely from Sultan Hotel to Semanggi Plaza. Until now, the total length of the MCB block that has been cleaned is 874 meters.

"It is done by brushing the parts that are difficult to clean using soap and then spraying water," he explained.

By doing so, he hoped that it could make the road more pleasing to the eye.

Linked News
Popular News indeks
  1. Jakarta Endorses New Housing Project for Residents on Railway Embankments

    access_time28-03-2026 remove_red_eye2351 personDessy Suciati
  2. Immersive Room and Glowing Forest Attractions Enliven Eid at TMII

    access_time26-03-2026 remove_red_eye991 personFakhrizal Fakhri
  3. Deputy Governor Watches Pelangi di Mars with Orphans

    access_time27-03-2026 remove_red_eye821 personTiyo Surya Sakti
  4. 292 East Jakarta Personnel Mobilized for Eid Return Rush

    access_time25-03-2026 remove_red_eye774 personNurito
  5. Jakarta's Mudik to Jakarta Program Hits Rp21 Trillion in Transactions

    access_time25-03-2026 remove_red_eye754 personFakhrizal Fakhri